Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 07/11/17 in all areas

  1. If its only a post analysis issue and analysis results are already okay, you can use excel sheets, other design tools or even hand calculations to calculate required reinforcement. Column design is pretty straightforward. Good luck.
    1 point
  2. If the total base shear is 900kN, how the columns are resisting 1000kN? Can't understand without look at your model.
    1 point
  3. Piers are designed at 2 locations. Top of story and bottom of story. Also, FYI Etabs assigns pier labels with respect to story level so that is why the same pier label can be repeated on different levels. Thanks.
    0 points
This leaderboard is set to Edmonton/GMT-06:00
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.