Dear Imran sb, Thank You, very much, we are on it. Slab is octagonal and pouring is done 4 portions first and then a gap and 4 are poured, temp is monitored by embedded sensor and readings are okay, a canopy is set above the slab and heaters are placed to maintain the temperature difference normal, scanning results are received, 50 readings, top/bottom 25/25, 50 percent are crossing into the core area or below the top bar, mostly are top side cracks, crack depths are max 20cm, cover to top rebar is 8cm. one thing i observed that mix design recommends 3 days strength 60/90 but in actual testing it is 87/90 in 3 days, rate of hydration is more then recommended or observed during trial mixes, please some data/example to calculate crack widths. Thank You