-
Posts
630 -
Joined
-
Last visited
-
Days Won
95
Content Type
Profiles
Forums
Events
Everything posted by Waqar Saleem
-
@Rana lkn tusan ne treka nhe dassya???goli kra ditti hai kam nu architect de khaty ech pa k
-
i mean there are jobs always which suit a person best and you have to do a lil struggle !!!pray to Allah and ask for His help then try you will be blessed.May Allah bless you
-
sure it is responsibility of architect but in field engineers supervise the work !!! there are chances when such events come to their jurisdiction :-)
-
Best of LUck brother !!!there is one opportunity exactly for you, just you have to show that you are looking for it, it will approach you itself :-)
-
being civil engineering community we deal with buildings offices residences mosques etc here i need to share one common carelessness about qibla direction i have seen WC facing qibla direction which is being muslim to be taken care of. so how we can find the exact qibla direction???and also i request seniors to maintain a check where ever they are responsible for it???
-
these two types are commonly known in civil engineering , and mostly one calls himself the superior to other. what is the truth and reality in this comparison ???
-
nhe te sysytem jam kr dian gy!!!@jammer
-
Can Fiberglass Structure Replace Steel Structure
Waqar Saleem replied to a topic in Member Introduction
but i guess the cost of fibers is much higher than steel so replacement is not seeming !!! -
indeed it is good platform for learners at every level and for seniors to transfer their experience while staying at their place and it is i guess the first active forum in Pakistani civil engineering community!!!thanx to Admin and All others who have active participation in this forum!!!
-
Thanx sir!!!
-
thanx !!!
- 12 replies
-
- sap2000
- time history
-
(and 1 more)
Tagged with:
-
how do we measure the length of a bar with 90 degree hook at both ends bars are required for a square footing size 9'-9"x9'-9",bar dia #5,i calculated it as 9'-9" - 2xcover + 2x(12db+pi x 6DB/4), where DB is the dia of bend i.e 3.75" for #5 bar and db is the dia of bar i.e 5/8" .is it ok???
-
wa Alaikomussalam bro welcome on the forum!!!
-
thanx ayesha!!! if i do response spectrum even then it wud be too much at this level???
- 12 replies
-
- sap2000
- time history
-
(and 1 more)
Tagged with:
-
any other brilliant answer knocking out Jammer n umar???
-
1st July,Dawn Islamabad A well reputed Islamabad based Construction Company is desirous to develop a new quarry by using latest technology.The persons having appropriate qualifications as well as hands on experience will be required to materialize the project.the following are needed in this regard to start with the preliminary work; 1. Quarry development Engineer (01) BSc.Eng/DAE with 15yr experience;at least 5yr in quarry field 2. Office Engineer(Female) for Head Office Islamabad (01) BSc.Engg.(civil) 2-5 years experience interested candidates fulfilling the said requirement are advised to send their detailed CV's at the following address within 15 days of the publication of this ad.(ad published 1st july) C/O DAWN ISLAMABAD BOX NO .087
-
1st july,Dawn,Islamabad Dar-ul-Sukun is the organization for physically and mentally challenged children since1969. We look for committed people to fill the following position; civil works supervisor ; Bachelor in civil engineering with experience in marking layouts and can easily read all the drawings. interested candidates please send CVs by 25th July,2012 at email or mailing address: darulsukun@hotmail.com, Dar-ul-Sukun 159/H/3, Kashmir Road, Karachi
-
when egg is good it sinks in the water but when it is rotten it start floating,according to science denser the matter it sinks and lighter the matter it floats so in case of egg nothing is taken out from egg as it is closed by shell how it once sinks and then floats even nothing is taken out or put in the matter it has?????
-
id do it with having and studying concepts of structural dynamics dnt wana perform it just on any software,i have not studied dynamics yet but have competent supervisor who did and he is willing to guide anyways,i have whole year to do my project so that i can study n build my concepts of dynamics with my supervisor at my own as uni doesnt have dynamics in the syllabus list!!!
- 12 replies
-
- sap2000
- time history
-
(and 1 more)
Tagged with:
-
hmmmmm!!!it is advance course sure but final year project students select one project and that wud be related to one of the general studies and this let the students to move towards some specific field .one can not choose the whole civil engineerining subjects,m not arguing sir im just discussing :-)
- 12 replies
-
- sap2000
- time history
-
(and 1 more)
Tagged with:
-
but why no sir what is the reason ???
- 12 replies
-
- sap2000
- time history
-
(and 1 more)
Tagged with:
-
Is it fine to have time history analysis project at under grad level?one of my friends suggested to choose some high rise buildings in islamabad nd perform time history analysis and comparison ?is it fine?
- 12 replies
-
- sap2000
- time history
-
(and 1 more)
Tagged with:
-
thanx alot Nustian371!!!
-
salam friends i need earthquake 2k5 data especially PGA values anyone who have this data plz share or let me know how to collect or where from?i am told that data be available at meteorological survey office but without any source they won't issue it.