-
Posts
630 -
Joined
-
Last visited
-
Days Won
95
Content Type
Profiles
Forums
Events
Everything posted by Waqar Saleem
-
thanx baz!!!
-
in the jammers reply at the end different end conditions are considered in 4th condition the effective length is the double of actual length this could make a sense plz explain how effective length is assigned actual*2.00???also in practical how do we consider that which side of column is free which is hinge which is restraining rotation how do we take this to actual condition in the filed???
-
thank you very much Nustian371!!!it is a nice explanation,i need to have the assessment of a RCC frame structure and thanx for uploading EMS-98 examples,plz send me the complete version at waqarraqaw@yahoo.co.uk
-
thanx!!!
-
i read it in "manual for the design of rcc building strcs" pg#17 n you are right it is UK published.you mean that short column and stocky columns both are exactly same ???
-
what steps are involved in vulnerability assessmnt?where from do we start?
-
this formula might be right sir but couldnt make the sense how a triangle is made out of spiral,perpendicular is made of pitch that makes sense but how pi*d is making the other perpendicular side ?
-
sure RANA sab but i am on the site in a far fledged area where i don't have electricity or cad available then how do i do that ?
-
thanx!!!
-
what are stocky columns?where and why they are used ??
-
how to calculate the length of spiral???if i use the pi*D that wud give the perimeter of circle but here is spiral.
-
thank you baz!!!if you dont mind plz upload the specific section of ACI code.i knew that you might have took my question other way round so that here i mentioned above load bearing column.
-
thanx :-)
-
i came to know in a book that in circular column there should be six bars used in minimum also one engineer said that according to ACI code six bars are required in a load bearing circular column .
-
thanx,i meant for quantities?
-
how the length of spiral tie in a column is calculated???
-
how vulnerability assessment of a building should be performed ?which software is better or should different software be used?
-
is fibre reinforced concrete used in Pakistan? what is the cost difference with normal rcc?what is the exact constituents of FRC?are they easily available in Pakistan?
-
it is very nice step to have separate thread for job posting it is great helping hand for the one in need!!!thanx admin
-
thanx RAna sab!!!
-
there isn't one designing which should be learnt there are many other aspects in civil engineering which could be shared,i suggested classes or meetings where different level professional can share there projects,problems and how they resolved them,i know very well that designing couldn't be taught
-
World's Largest Building In 90 Days
Waqar Saleem replied to Badar (BAZ)'s topic in Engineering Marvels & Disasters
no it was nt years they took 6months to plan and fabricate and mounted in 90 days!!! -
@aisha i dont think that sharing of knowledge or managing a class for juniors once a week is a big deal either you are in a design office or anywhere,a senior can just share the work he has been working at the time he has nothing to do extra !!!
-
I have an idea that if a seniors manage some weekly meetings on skype in which different topics are discussed !!! or there is a teaching site "wiziq"there lectures can be delivered free of cost and also can be recorded!!! i guess such activity can also help the freshers and engg students.so what wud seniors say about that suggestions
-
what about the DAM structure analysis and design as final year project???is it feasible and practical ????