Jump to content

ILYAS

Member
  • Posts

    84
  • Joined

  • Last visited

  • Days Won

    21

Everything posted by ILYAS

  1. Please solve one frame manually with these conditions ,you will understand
  2. Anybody have literature or drawings of REINFORCED COCRRETE PROTECTIVE GALLERY /SNOW SHED IN HIGHWAY/ avalanches in highway?
  3. no man,never designed retaining wall of pcc above 6ft even.
  4. NEW ACI CODE has been released after 5 years.please go through that.
  5. because research through lab experiment (testing of beam /column) proved that 135 degree is more effective than any other angle.
  6. please consult geotech engineer for slope stability
  7. please consult with geotechnical enginner
  8. for how much depth you are excavating?
  9. By just looking at elevation of building nobody will tell you that how much thickness is required .
  10. this is not layering,same property mat will be used throughout.He can define another mat property of 48 inch thick .
  11. option 1:48 slab with mat property instead of drop property
  12. 1-STRUCTURE DESIGN ENGINEER IS REQUIRED AT LAHORE WITH 3 -5 YEAR EXPERIENCED IN HIGH RISE BUILDINGS AND SHORING WORKS.PLEASE SEND YOUR CV AT ilyasniazi@ndapak.com.
  13. if anyone need helps in any kind of shoring works( soil nail wall,secant piles,contigous piles,strutting action,cantilever piles,anchor design,top down construction etc).please tell me so we can discuss here.
  14. plaxis 2D can be used but it it is very costly
  15. machine foundation (ACI351.2-10,ACI351.3-04). and for floor vibration ISO 2372
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.