Joint assignment for RCC Wall in basement in a frame structure modelled in SAP2000
Hello,
I am designing a frame structure in SAP2000 which has a RCC wall in basement upto the bottom of floor beams. Should I divide the wall into 2'x2' squares and then assign fixed supports to all the wall shells or not?