Jump to content

Search the Community

Showing results for tags 'Concrete Casting Temperature'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Member Introduction
    • Shout Box
    • Students Zone
    • Engineering Marvels & Disasters
  • Civil/ Structural Engineering
    • General Discussion
    • Steel Design
    • Concrete Design
    • Seismic Design
    • Foundation Design
    • Software Issues
    • Journal/ Articles/ Tutorials
    • Spreadsheets & Softwares
  • Technical Support
    • Website Announcements/ Problems/ Login/ Registration Issues
  • PSX Stocks Investing's Topics
  • Parenting's Topics
  • Construction Consulting's Industrial Construction Project
  • Construction Consulting's Piling

Calendars

  • Community Calendar
  • Construction Consulting's Piling

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Location


University


Employer


Interests

Found 1 result

  1. Hi all i need to have a discussion on this topic which is the specifications allow maximum concrete temperature at time of placement 32C where as the temperature of the concrete which is sampled for mix design of concrete is 27C in my view this does not depict the actual condition in which temperature will remain around 32C hence more requirement of water thus decreasing strength, therefore in my view if the design mix cubes were made at the concrete temperature of 32C the cement content required would have been more for a selected W/C ratio of say .45
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.