Jump to content

Search the Community

Showing results for tags 'IBC 2009 1809.13'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Member Introduction
    • Shout Box
    • Students Zone
    • Engineering Marvels & Disasters
  • Civil/ Structural Engineering
    • General Discussion
    • Steel Design
    • Concrete Design
    • Seismic Design
    • Foundation Design
    • Software Issues
    • Journal/ Articles/ Tutorials
    • Spreadsheets & Softwares
  • Technical Support
    • Website Announcements/ Problems/ Login/ Registration Issues
  • PSX Stocks Investing's Topics
  • Parenting's Topics
  • Construction Consulting's Industrial Construction Project
  • Construction Consulting's Piling

Calendars

  • Community Calendar
  • Construction Consulting's Piling

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Location


University


Employer


Interests

Found 1 result

  1. Assalam o alaikum, I am designing a concrete frame in seismic zone 4 to which I have assigned seismic design category E. I ave insufficient data for site soil so I have assumed soil type Sd. Now I m to ask that IBC 2009 1809.13 says,footings must be interconnected. Whether this requirement only for Site Classification as E,F or it is for all site classifications? Moreover this requirement means tie beams must be at footing level or Tie beams provided at plinth level also satisfies this provision? Thanks.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.