Assalam O Alykum
In one of our under construction project we are using hollow block work walls.
My question is at the location of fixtures toilet or kitchen ( Wet areas) means WC and Wash basin,
Solid block work wall is better or Filled the layer with M20 concrete as the hollow block work will surely get crack after some time.
Thank you