Jump to content

Search the Community

Showing results for tags 'joints'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Member Introduction
    • Shout Box
    • Students Zone
    • Engineering Marvels & Disasters
  • Civil/ Structural Engineering
    • General Discussion
    • Steel Design
    • Concrete Design
    • Seismic Design
    • Foundation Design
    • Software Issues
    • Journal/ Articles/ Tutorials
    • Spreadsheets & Softwares
  • Technical Support
    • Website Announcements/ Problems/ Login/ Registration Issues
  • PSX Stocks Investing's Topics
  • Parenting's Topics
  • Construction Consulting's Industrial Construction Project
  • Construction Consulting's Piling

Calendars

  • Community Calendar
  • Construction Consulting's Piling

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Location


University


Employer


Interests

Found 2 results

  1. Hello Experts, I am designing a G+2 denim factory with isolated footing, On the ground floor is a heavy warehouse and lifters will move on it. Do I have to model the plinth level in Etabs model with all the storage loads as defined by codes ? or just simply ignore the plinth level and model the super structure ?
  2. We are looking for some reference for placement of concrete in tunnel. What is the maximum horizontal length of placement of concrete and at what interval we can place the next adjacent pour of concrete.? Is there any code limitation on this or we can go to the next pour placement.?
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.