Jump to content

Search the Community

Showing results for tags 'queryy'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Member Introduction
    • Shout Box
    • Students Zone
    • Engineering Marvels & Disasters
  • Civil/ Structural Engineering
    • General Discussion
    • Steel Design
    • Concrete Design
    • Seismic Design
    • Foundation Design
    • Software Issues
    • Journal/ Articles/ Tutorials
    • Spreadsheets & Softwares
  • Technical Support
    • Website Announcements/ Problems/ Login/ Registration Issues
  • PSX Stocks Investing's Topics
  • Parenting's Topics
  • Construction Consulting's Industrial Construction Project
  • Construction Consulting's Piling

Calendars

  • Community Calendar
  • Construction Consulting's Piling

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Location


University


Employer


Interests

Found 1 result

  1. Assalamoalaikum to all members! fisrt of all my apologies for any sort of mistake, this is my first post in this form. i am currently working as a site engineer at a consultant, working for C & W Pak. the project, my consultant doing is, the Modeling of the Earth quick effected College located at Gul Abad, Dir lower. the zone is 3. the soil is sandy soil having boulders at the depth of 8 feet below. what kind of soil it is? i have noticed that the ties spacing all over the height of the columns according to structure engineer is 2.5" c/c. isn't it very low spacing. according to ACI 318-05 what should be the minimum spacing between the ties? the longitudinal reinforcement in the columns are 8 #6 bars. (i am fresh civil engineer having no experience on site).
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.