Jump to content

Search the Community

Showing results for tags 'settlement'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • General
    • Member Introduction
    • Shout Box
    • Students Zone
    • Engineering Marvels & Disasters
  • Civil/ Structural Engineering
    • General Discussion
    • Steel Design
    • Concrete Design
    • Seismic Design
    • Foundation Design
    • Software Issues
    • Journal/ Articles/ Tutorials
    • Spreadsheets & Softwares
  • Technical Support
    • Website Announcements/ Problems/ Login/ Registration Issues
  • PSX Stocks Investing's Topics
  • Parenting's Topics
  • Construction Consulting's Industrial Construction Project
  • Construction Consulting's Piling

Calendars

  • Community Calendar
  • Construction Consulting's Piling

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


Website URL


Skype


Location


University


Employer


Interests

Found 6 results

  1. plz help me out of this problem.. the foundation is settling down week by week. it is a warehouse. a big Under ground water tank is adjacent to the failed column. we have only little space to work. this is in dubai. Suggestions please what so i can do. plz do reply
  2. Salam Alaykom All, I am modeling a refugee camp on Etabs. I have over 20 buildings to be modeled, each 5 share the same raft foundation , and each raft foundation is no more than 3 meters away from the other. For simplicity I modeled all 20 buildings in the same Etabs Model to Calculate the forces on the raft foundations. My question is : 1_ Will the Raft Foundations be Affected by each other , knowing that the buildings they support arent connected in any way?
  3. I m designing a 4 storey building on a poorly graded sand with SPN value of 5 and allowable bearing capacity of 0.5 tonn/sq.ft..... for the mat foundation, i provided beams of 18 x 36 and mat thickness as 24 inches ... however the soil pressure are still above safe bearing capacity.. My question is should i assign line spring property to the footing beams or not??? The area of footing is also increased but the stresses are still high...
  4. Assalam o alaikum seniors, I am searching for some design example of TIE BEAM DESIGN.... I am having sap reactions of all the columns.. I need detail of manual design of tie beam. Or info how to design it. I also want to design it for differential settlement of columns and for lateral loads also... How shud i take these loads in my design??? If i design this beam in sap2000, i apply gravity load and support settelemnt of 25 mm at one end of beam and design it, will it be OK? Shud i take soil reaction from bottom or shud i neglect it? Jazak Allah...
  5. Some people check settlement of RAFT foundation on SAFE by viewing the deformed shape. Is it fine to do so?
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.