Captive Columns


Fatima Khalid
 Share

Recommended Posts

Asalamualaikum

It is said that “ There should be no columns with height to depth ratio less than 75% of the nominal height to depth ratio of typical column at that level”

for example I have a building having column clear height 10feet and its cross section is 18”x 18”, next to column there is an opening of 3ft wide by 6 feet high till the soffit of the beam. How to check the above provision? what height to depth ratio is need to be considered. I have studied that depth of the column should be parallel to wall? why it needs to be parallel to the wall? 

Nominal height to depth ratio = 10feet/18inch

short column height to depth ratio (unsupported) = 6feet/3feet

Is the above calculation correct?

Thanks

Link to comment
Share on other sites

While doing seismic assesment using FEMA357, there is a provision for captive columns whether they are present in a structure or not? So the documents states that “There should be no column with height to depth ratio less than 75% of the nominal height to depth ratio of column at that level”

If its more than 75%, it means a captive column is present in the structure

Now I am confused what is height to depth ratio of column? and what are we comparing this column with?

Link to comment
Share on other sites

This is sort of creating a short column in the structure due to architectural features. 

On a certain storey level you will have your story height and most of the columns are of same length but if any column due to any addition to structure is reduced in size it will cause a short captive column which  attract more seismic shear due to stiffness. we try to avoid these elements or detail them adequately. See attached commentary it will explains you much better hopefully.  

image.png.9adb72aba284c40b085d0ac4e7f10407.png

Link to comment
Share on other sites

17 hours ago, Fatima Khalid said:

While doing seismic assesment using FEMA357, there is a provision for captive columns whether they are present in a structure or not? So the documents states that “There should be no column with height to depth ratio less than 75% of the nominal height to depth ratio of column at that level”

If its more than 75%, it means a captive column is present in the structure

Now I am confused what is height to depth ratio of column? and what are we comparing this column with?

Got you now. I have not done any practical design or check for Captive Columns but as per my understanding, the height of columns refer to the unsupported length(say L1) and depth means the dimension of column along the wall(Say D1). So you do L1/D1 for captive column. Now take average depth and lengths of columns at that storey and let them be L2 and D2. Now ratio L2/D2 for normal column. You compare both these ratios for the given allowable percentage of 75% i.e., {0.75xL2/D2}>L1/D1.

Hope this answers your question.🙂

Link to comment
Share on other sites

11 hours ago, Nustian371 said:

This is sort of creating a short column in the structure due to architectural features. 

On a certain storey level you will have your story height and most of the columns are of same length but if any column due to any addition to structure is reduced in size it will cause a short captive column which  attract more seismic shear due to stiffness. we try to avoid these elements or detail them adequately. See attached commentary it will explains you much better hopefully.  

image.png.9adb72aba284c40b085d0ac4e7f10407.png

Dear Nustian371, I think Fatima is not asking for the theory or concept behind the captive columns and how they behave. Instead she was asking about the explanation of the limit set by FEMA on such columns.

Link to comment
Share on other sites

@Fatima Khalid But one thing to note here is that the unsupported length we are considering for our captive columns is the one supported with walls. In your case L1=10', D1=18". L2=4', D2=18".

0.75xL1/D1>L2/D2.

Which will be true in your case. That means that your columns will be considered captive columns only if the wall height exceeds 7.5'.

Would like to here from other group members too about this.

Link to comment
Share on other sites

@Fatima Khalid, as I said, I have not done such checks personally in a practical project so I can't guarantee what I said but as per my understanding, it should be 4'. If you consider your unsupported length as 6', you are not going to get a Captive column for lengths where your wall height increases which doesn't seem correct when you go through the captive column definition. As per my understanding, if your wall height increases, the column should go near the threshold of captive column.

Let me know your take after considering my views.

Link to comment
Share on other sites

  • 3 weeks later...
On 2/22/2020 at 10:32 AM, Fatima Khalid said:

I have studied that depth of the column should be parallel to wall? why it needs to be parallel to the wall? 

1.     "Captive Columns" are in fact start of as unrestrained (long) columns which then become "laterally restrained", by walls coming into the side of them, normally in one direction. They are therefore captive in one direction.

2.     Under seismic loading, the column is subject to lateral - horizontal forces in BOTH direction - so for this directional force this column length & depth (in each direction) needs to be checked.

3.     For direction into the building, where the column is clear full height, no lateral restraint: 10'/1.5'

4.     For direction along the building perimeter frame: 6'/1.5'

5.     It important that structural engineers look at BOTH structural & non-structural architectural walls, beams, coming into the 'side' of the column, and thus making the column captive - and design accordingly.

6.     One way to overcome this is to have the architectural wall run past the face of the column on the outside. This will mean cantilevering the slab sufficiently to have the wall sitting on slab. Wall detailing and tying to column detail would be be considered carefully in this case.

7.     This Captive or Short column always attract much higher proportion of lateral earthquake loading due to their modified slenderness/stiffness, and will therefore need to be designed AND detailed accordingly to avoid its failure.

 

image.png.85b89bf7f1a5940390a0f63e05e8d04d.png

 

 

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Our picks

    • Hi there,
      I am interested in performing "Performance Based Design" for a 20 story building. 
      I'll be performing "Non-Linear Static Pushover Analysis" for my model. Until now, I have decided to go with "Displacement Co-efficient method". I will be using ETABS 2017 for performing Pushover Analysis. While assigning plastic hinges, I have an option of using ASCE 41-17 (Seismic Evaluation and Retrofit of Existing buildings". I would like to know what would be a better estimate for relative distances for plastic hinges in case of beams, columns. Any input concerning assignment of hinges to beams, columns and shear walls is highly appreciated. Normally it's taken 0.05 and 0.95 or 0.1 and 0.9. What's your opinion on this?
      Secondly, it would be great if someone can recommend me a book or some good source to understand how to characterize building using performance levels. Any sort of help is appreciated.
      I have recently graduated and joined a structural design firm, so kindly guide me, considering me a beginner.

       
      • 2 replies
    • *SEFP Consistent Design*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Pile Design*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Doc No: 10-00-CD-0007*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Date: April 16, 2018*

      1.1. FUNCTION OF JOINT

      Beam-column joint must transfer the forces, such as moment, shear and torsion, transferred by the beam to the column so that the structure can maintain its integrity to carry loads for which it is designed.

      Another function of the beam-column joint is to help the structure to dissipate seismic forces so that it can behave in a ductile manner.

      1.2.WHY DO WE CARE

      During an extreme seismic event, the code-based structure is expected to maintain its load-carrying capacity for gravity loads even after the structure deforms into inelastic range so that it does not pose any life safety hazard. Hence, the joint can go through significant degradation of strength and stiffness, and if it fails in shear, or anchorage, the life-safety objective of code cannot be achieved.

      1.3.CONSEQUENCES OF FAILURE


      1.4.THINGS TO CONSIDER FOR BEAM COLUMN JOINT

      Longitudinal bars of beams, or slab, must be able to develop their yield stress, so that the beam/slab can transfer moment to joint. It means that longitudinal bars must have adequate development length for hooked bars. This implies that the size of the column must be such that bars can develop their tensile forces. If bars can transfer moment, they can also transfer shear as far as monolithic construction is concerned.


      The shear strength of the joint must enable the transfer of moment and shear through it.



      The joint should be Constructible: Congestion of reinforcement is the main concern.

      1.5.DESIGN SHEAR FOR BEAM COLUMN JOINT

      The design shear for beam-column joint depends upon the relative strength of beam and column at the joint.

       
      • 4 replies
    • *Comments/Observations regarding modelling in ETABS*

      *Doc No: 10-00-CD-0006*

      *Date: May 06, 2017*

      Some of the observations made during extraction of results from ETABS (v 9.7.4), for design of reinforced concrete members, are being share in this article.,

      1) Minimum Eccentricity

      ETABS always considers the minimum eccentricity for selecting the design moment of columns irrespective of the probable behavior of the column, whether short or long column. See section 10.10.6.5 and its commentary of ACI 318-08 which deals with minimum eccentricity of long columns. You should always check the design moments that ETABS uses for columns if you want to bring down the cost of construction.

      2) Unbraced/ Braced Preference

      ETABS always performs analysis of frame as if it is un-braced. You should investigate if the storey under consideration is braced, or un-braced (10.10.5.2), and decide appropriate design moments of columns.

      3) Time Period

      ETABS has a tendency to select a time period of the building that is considerably less than the value obtained by the approximate method, Method A, of the section 1630.2.2  of UBC 97. To quote the FEMA 451 document: ''Because this formula is based on lower bound regression analysis of measured building response in California, it will generally result in periods that are lower (hence, more conservative for use in predicting base shear) than those computed from a more rigorous mathematical model". So, there is no need to use the value of time period that is lot less than Ta. One should always check the time period used by the software; ETABS can overestimate the seismic force by more than 2 times.

      Visit the forum link to read the complete article.
      Link: http://www.sepakistan.com/topic/2300-commentsobservations-regarding-modelling-in-etabs/
      • 0 replies
    • The minimum amount and spacing of reinforcement to be used in structural floors, roof slabs, and walls for control of temperature and shrinkage cracking is given in ACI 318 or in ACI 350R. The minimum-reinforcement percentage, which is between 0.18 and 0.20%, does not normally control cracks to within generally acceptable design limits. To control cracks to a more acceptable level, the percentage requirement needs to exceed about 0.60% (REFRENCE ACI COMMITE REPORT 224R-01)



       

       



       

       

      So according to above statement , should we follow 0.60%, to be on more safe side??



       
      • 12 replies
    • Dear Sir/Madam,

      This email is an invitation for the participation in the First South Asia Conference on Earthquake Engineering (SACEE-2019) which will be held on 21-22 February 2019 in Karachi, Pakistan. This conference is the inaugural event in this series of conferences which has been constituted under the auspices of South Asia Earthquake Network (SHAKE). The organisers of the conference include NED University, University of Porto, University of Fuzhou, University Roma Tre and Institution of Engineers Pakistan. The conference website can be visited at http://sacee.neduet.edu.pk/.

      Please note that world leading earthquake engineering experts have confirmed their participation in the conference. These include Prof Abdelkrim Aoudia (Italy), Prof Alper Ilki (Turkey), Dr Amod Mani Dixit (Nepal), Prof Bruno Briseghella (Italy), Prof George Mylonakis (UK), Prof Khalid Mosalam (USA), Prof Humberto Varum (Portugal) and many others. The presence of these distinguished experts allows you to exchange your work/issues with them and discuss possibility of any future collaboration. Please note that participation in the conference is strictly based on registration. Early registration in different categories at reduced rates are available till 10 December 2018. Please visit the conference website to see the details and the link for registration.

      If there are any queries, please do not hesitate to contact the Conference Secretary at the following address

      Prof. Muhammad Masood Rafi
      Conference Secretary- SACEE-2019
      Chairman
      Department of Earthquake Engineering
      NED University of Engineering & Technology Karachi, Pakistan.
      Phone: 0092-21-992-261261 Ext:2605
      Email: rafi-m@neduet.edu.pk
    • What is the Minimum reinforcement For Precast Pile  according to different codes (ACI,BS)??  Pile length is 40 times of pile least dimension . 
      • 1 reply
    • Dear members, I am working on a 10 storied rcc factory building with one basement,  where floor loads are in general 125 psf(Live) . but there are 2 warehouse in the building at ground floor & 10th floor where the Live load of stacked materials are 450psf. I have modeled it and analysed in ETABS. After analysis, seeing the floor displacement for seismic load,  i am in big shock to see the pattern. the displacement pattern suddenly increased hugely & then got normal . if the warehouse load created problem, then why it effected only Ground floor level, not the 10th floor! Please tell me how can i solve it. 
      • 1 reply
    • Asalamualaikum all,

      I have columns which are conflicting with the underground water tank as shown in figure.
       

      So I have decided to make underground water tank base slab as a footing for column. So I import etabs model to safe and just take uniform water load on base slab and point load from columns.

      This is the residential house. The BC is 2tsf. But SAFE is showing tension on the base slab and the thickness from punching is 30''. I believe that thickness is too high. What can be the error? Is this approach is correct for design base slab of ugwt to carry load of two edge columns?
      • 11 replies
    • SAFE perform iterative uplift analysis,any one having experience how to check the results of this analysis???what is the purpose and scope of this analysis???
      • 15 replies
    • Shear wall design
      AOA 

      i am facing problems in shear wall design .what are the pier and spandral ?what will be the difference when we assign pier or spandral? without assigning these the shear wall design is incomplete .

      i am taking about etabsv16

      someone have document about shear wall design plz provide it 

      thank you

       
      • 13 replies
  • Tell a friend

    Love Structural Engineering Forum Of Pakistan? Tell a friend!
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.