Use This Checklist To Avoid Missing Critical Planning Steps


Recommended Posts

Who doesn’t love a checklist? We use them every day from a simple list of groceries that we check off at the store to a comprehensive flight readiness checklist that is done before a pilot takes off. But, there are few people that love checklists as much as project managers.

After all, aren't your project plans just one big checklist of things that need to be marked off in order to complete the project? Whatever doesn’t fit on the project plan checklist is then stored on our daily to-do checklist that we keep by our side at all times.

The following checklist of 12 activities for planning a project can serve as a reference for new project managers and a reminder for those that may be more experienced. It’s good to run down this list from time to time to make sure you haven’t missed a critical step when it comes to planning a project.

1. Define the Scope

This is an important first step in planning a project because it answers the question of what it is that needs to be completed. This scope needs to clearly articulate and define what this project looks like, why it’s important, what it needs to accomplish, and roughly when it needs to be complete.

2. Identify Your Project Supporters

The project that is defined from above must have sponsors or stakeholders that the completion of this project is important to. Find out who these people are. They may be funding the project, or have the influence necessary to keep the project moving forward when the going gets tough. Establish a relationship with this group of people and communicate with them on a regular basis about the good, the bad, and the ugly that is happening with your project. Their vested interest will help you get more done with less aggravation.

3. Determine Resources that Are Available

Based upon the scope defined in Step 1, you should have a pretty good idea of what type of resources will be needed to complete the project. Are they technical in nature? Do they need a special skill set or training? Are they already on-site and available or will they need to be hired or contracted in order to complete the project? This will give you a good sense of what you will need to do fill in any major gaps when it comes to resources planning.

4. Check the Timeline

A big part of planning a project is to understand the timeline that has been associated with a project. In a perfect world, the scope and resources available should determine how long the project will take. But, we all know that many times this is not the case. Market pressures will accelerate how fast a project needs to be finished in order to compete with new technology. Or, perhaps a salesperson committed a date to a client in order to get the deal without really knowing what it takes. Get a sense of what you are dealing with so you can determine if it will be feasible with what you have in place already or if creative project planning will be necessary.

5. List the Big Steps

This is a simple way of saying to start putting together your Work Breakdown Structure (WBS). However you breakdown your WBS (deliverable, service, hybrid, etc.) you need to start thinking about those activities and deliverables that are big and discrete enough to go along the top level of this hierarchy. This will help you determine whether you have captured “the big picture” of what needs to be done to complete this project.

6. Break Down the Smaller Steps

Once you’ve determined what the big steps are, now break them down into smaller chunks of bite-size work that can be doled out to the team. For example, one of the Big Steps from Step 5 above may be Documentation Complete. The smaller steps would then consist of deliverables along the lines of Technical Manual, Release Notes, and Training Manual. This could be broken down even further into Write Manual, Design Manual, and Print Manual. This process helps ensure each deliverable is seen to its completion.

7. Develop a Draft Plan

When it comes to planning a project, at this point you know what the project is, how long you have to do it, the resources that are available, and roughly what needs to be done. This is when you put together a DRAFT plan. This is your first stab at combining the dates, deliverables, and resources together. It’s the time to identify dependencies and include them in the plan At this point you are working on the plan in a vacuum. That’s why it’s called a draft plan. Because, the moment it sees the light of day and your team gets their eyes on it, they will identify all the things you missed or got wrong. That’s what Step #8 is for.

8. Create your Baseline Project Plan

Now that you have the draft complete, you want the feedback from your team. Review it with them. Let them know your thought process when it comes to planning a project of this type. Let them think about it and then listen to their feedback. They will recognize areas that you may have missed, are technically impossible, or may conflict (or benefit from) some other initiative that is already in progress. Take it all in, weigh each suggestion against your experience and discretion, and then develop version 1.0 of the project plan.

9. Refine the Plan Based upon Reality

Now that the plan is moving forward, reflect and refine based upon the reality of what is actually happening on the project. Are things going well or running behind? Make adjustments accordingly. This can be either to the plan or to how the plan is being executed, for example, bringing on more resources to complete it on time or reducing the scope and moving some deliverable to a future phase.

10. Monitor Progress

Progress will need to be something that is constantly monitored on a daily basis. Is the plan staying on track? Are issues being addressed and resolved in a timely manner? It’s your job as a project manager in planning a project to include how progress and success will be monitored throughout the duration of the project.

11. Document Everything

Planning a project has to do as much with understanding that things will change as it does putting the original plan together. Make sure you keep up with these changes in writing and update documentation to reflect reality frequently. There’s nothing worse than someone realizing way into the project that they were working off the wrong version of the specification document or project schedule and find themselves separated from where the rest of the team was heading.

12. Keep Everyone Up-to-Date

Finally, you need to include mechanisms in your project plan that will keep everyone up-to-date. It may be a simple “everything is just fine” message that is blasted out to anyone and everyone interested in the progress of the project to an emergency conference call in order to address a problem that just arose. Don’t leave the communication plan to chance. If you do, people that need to know and that can help with the success of the project may not have the information they need to assist.

That’s it. 12 “easy” steps to plan a project. While this is certainly not an exhaustive list of every single step necessary to plan a project, it is a good starting point to make sure that your project gets off the runway safe and sound.

Link to comment
Share on other sites

  • 1 year later...

Thanks for the check list Muhammad. Though its quite optimistic and very brief, i liked this list and found it really useful. I believe that a Project is constructed thrice, once in minds, then in Papers followed by real construction. Fortunately, this list covers all stages of a Project.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
  • Our picks

    • Hi there,
      I am interested in performing "Performance Based Design" for a 20 story building. 
      I'll be performing "Non-Linear Static Pushover Analysis" for my model. Until now, I have decided to go with "Displacement Co-efficient method". I will be using ETABS 2017 for performing Pushover Analysis. While assigning plastic hinges, I have an option of using ASCE 41-17 (Seismic Evaluation and Retrofit of Existing buildings". I would like to know what would be a better estimate for relative distances for plastic hinges in case of beams, columns. Any input concerning assignment of hinges to beams, columns and shear walls is highly appreciated. Normally it's taken 0.05 and 0.95 or 0.1 and 0.9. What's your opinion on this?
      Secondly, it would be great if someone can recommend me a book or some good source to understand how to characterize building using performance levels. Any sort of help is appreciated.
      I have recently graduated and joined a structural design firm, so kindly guide me, considering me a beginner.

       
      • 2 replies
    • *SEFP Consistent Design*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Pile Design*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Doc No: 10-00-CD-0007*<br style="background-color:#ffffff; color:#272a34; font-size:14px; text-align:start">*Date: April 16, 2018*

      1.1. FUNCTION OF JOINT

      Beam-column joint must transfer the forces, such as moment, shear and torsion, transferred by the beam to the column so that the structure can maintain its integrity to carry loads for which it is designed.

      Another function of the beam-column joint is to help the structure to dissipate seismic forces so that it can behave in a ductile manner.

      1.2.WHY DO WE CARE

      During an extreme seismic event, the code-based structure is expected to maintain its load-carrying capacity for gravity loads even after the structure deforms into inelastic range so that it does not pose any life safety hazard. Hence, the joint can go through significant degradation of strength and stiffness, and if it fails in shear, or anchorage, the life-safety objective of code cannot be achieved.

      1.3.CONSEQUENCES OF FAILURE


      1.4.THINGS TO CONSIDER FOR BEAM COLUMN JOINT

      Longitudinal bars of beams, or slab, must be able to develop their yield stress, so that the beam/slab can transfer moment to joint. It means that longitudinal bars must have adequate development length for hooked bars. This implies that the size of the column must be such that bars can develop their tensile forces. If bars can transfer moment, they can also transfer shear as far as monolithic construction is concerned.


      The shear strength of the joint must enable the transfer of moment and shear through it.



      The joint should be Constructible: Congestion of reinforcement is the main concern.

      1.5.DESIGN SHEAR FOR BEAM COLUMN JOINT

      The design shear for beam-column joint depends upon the relative strength of beam and column at the joint.

       
      • 4 replies
    • *Comments/Observations regarding modelling in ETABS*

      *Doc No: 10-00-CD-0006*

      *Date: May 06, 2017*

      Some of the observations made during extraction of results from ETABS (v 9.7.4), for design of reinforced concrete members, are being share in this article.,

      1) Minimum Eccentricity

      ETABS always considers the minimum eccentricity for selecting the design moment of columns irrespective of the probable behavior of the column, whether short or long column. See section 10.10.6.5 and its commentary of ACI 318-08 which deals with minimum eccentricity of long columns. You should always check the design moments that ETABS uses for columns if you want to bring down the cost of construction.

      2) Unbraced/ Braced Preference

      ETABS always performs analysis of frame as if it is un-braced. You should investigate if the storey under consideration is braced, or un-braced (10.10.5.2), and decide appropriate design moments of columns.

      3) Time Period

      ETABS has a tendency to select a time period of the building that is considerably less than the value obtained by the approximate method, Method A, of the section 1630.2.2  of UBC 97. To quote the FEMA 451 document: ''Because this formula is based on lower bound regression analysis of measured building response in California, it will generally result in periods that are lower (hence, more conservative for use in predicting base shear) than those computed from a more rigorous mathematical model". So, there is no need to use the value of time period that is lot less than Ta. One should always check the time period used by the software; ETABS can overestimate the seismic force by more than 2 times.

      Visit the forum link to read the complete article.
      Link: http://www.sepakistan.com/topic/2300-commentsobservations-regarding-modelling-in-etabs/
      • 0 replies
    • The minimum amount and spacing of reinforcement to be used in structural floors, roof slabs, and walls for control of temperature and shrinkage cracking is given in ACI 318 or in ACI 350R. The minimum-reinforcement percentage, which is between 0.18 and 0.20%, does not normally control cracks to within generally acceptable design limits. To control cracks to a more acceptable level, the percentage requirement needs to exceed about 0.60% (REFRENCE ACI COMMITE REPORT 224R-01)



       

       



       

       

      So according to above statement , should we follow 0.60%, to be on more safe side??



       
      • 12 replies
    • Dear Sir/Madam,

      This email is an invitation for the participation in the First South Asia Conference on Earthquake Engineering (SACEE-2019) which will be held on 21-22 February 2019 in Karachi, Pakistan. This conference is the inaugural event in this series of conferences which has been constituted under the auspices of South Asia Earthquake Network (SHAKE). The organisers of the conference include NED University, University of Porto, University of Fuzhou, University Roma Tre and Institution of Engineers Pakistan. The conference website can be visited at http://sacee.neduet.edu.pk/.

      Please note that world leading earthquake engineering experts have confirmed their participation in the conference. These include Prof Abdelkrim Aoudia (Italy), Prof Alper Ilki (Turkey), Dr Amod Mani Dixit (Nepal), Prof Bruno Briseghella (Italy), Prof George Mylonakis (UK), Prof Khalid Mosalam (USA), Prof Humberto Varum (Portugal) and many others. The presence of these distinguished experts allows you to exchange your work/issues with them and discuss possibility of any future collaboration. Please note that participation in the conference is strictly based on registration. Early registration in different categories at reduced rates are available till 10 December 2018. Please visit the conference website to see the details and the link for registration.

      If there are any queries, please do not hesitate to contact the Conference Secretary at the following address

      Prof. Muhammad Masood Rafi
      Conference Secretary- SACEE-2019
      Chairman
      Department of Earthquake Engineering
      NED University of Engineering & Technology Karachi, Pakistan.
      Phone: 0092-21-992-261261 Ext:2605
      Email: rafi-m@neduet.edu.pk
    • What is the Minimum reinforcement For Precast Pile  according to different codes (ACI,BS)??  Pile length is 40 times of pile least dimension . 
      • 1 reply
    • Dear members, I am working on a 10 storied rcc factory building with one basement,  where floor loads are in general 125 psf(Live) . but there are 2 warehouse in the building at ground floor & 10th floor where the Live load of stacked materials are 450psf. I have modeled it and analysed in ETABS. After analysis, seeing the floor displacement for seismic load,  i am in big shock to see the pattern. the displacement pattern suddenly increased hugely & then got normal . if the warehouse load created problem, then why it effected only Ground floor level, not the 10th floor! Please tell me how can i solve it. 
      • 1 reply
    • Asalamualaikum all,

      I have columns which are conflicting with the underground water tank as shown in figure.
       

      So I have decided to make underground water tank base slab as a footing for column. So I import etabs model to safe and just take uniform water load on base slab and point load from columns.

      This is the residential house. The BC is 2tsf. But SAFE is showing tension on the base slab and the thickness from punching is 30''. I believe that thickness is too high. What can be the error? Is this approach is correct for design base slab of ugwt to carry load of two edge columns?
      • 11 replies
    • SAFE perform iterative uplift analysis,any one having experience how to check the results of this analysis???what is the purpose and scope of this analysis???
      • 15 replies
    • Shear wall design
      AOA 

      i am facing problems in shear wall design .what are the pier and spandral ?what will be the difference when we assign pier or spandral? without assigning these the shear wall design is incomplete .

      i am taking about etabsv16

      someone have document about shear wall design plz provide it 

      thank you

       
      • 13 replies
  • Tell a friend

    Love Structural Engineering Forum Of Pakistan? Tell a friend!
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and Guidelines.