  1. Yes. Preheater Tower that I have to design is a concrete structure that support different equipment of cement industry. (as also shown in pic that you uploaded in your previous comment.But your pics shows that it is steel structure truss and I have to design concrete structure with same equipment)
  2. It is not look like as you are thinking. It is concrete structure not steel structure. Yes, I contacted with vendor also. they are saying that maximum of 305KN vertical Dead load and 100KN vertical live load are present in this structure at one story. I just want to ask that how I apply loading in ETAB. means it is uniform loading in dead load (Static load cases option) or vertical point load. Because, these tower crossing from slab's opening in the structure.
  3. Dear All, Is there any one who know, how to design Pre-Heater tower of 80m height of any cement factory in ETAB? Means what type of forces will apply in ETAB? What will will live laod and dead load apply in ETAB? what will be the load combination? etc I made simple model of structure, but didn't load load yet.. I am waiting your kind reply
  4. Thanks Mr Uzair; above links are very informative. It will InshAllah definitely help me. Secondly, how to do calculation for welding of bars when cage of pile is lifting? and how to define lifting points on cage? Thanks you very much.
  5. Yes. i understand what you said above.. you have any example or material regarding this?
  6. I have to provide calculation with drawing: 1. welds definition (calculation), 2. The hooks that will hang the rebar cage on the casing during concreting. I have to provide dimensions and weld definition. 3. Definition of stiffeners inside the casing. : position of stiffeners and dimensions and weld definition. 4. Definition of lifting points
  7. Thanks Mr. Umer.. I got your teacher point. how we do liquefaction and heterogeneity? I didn't understand this one... (sorry for late reply..)
  8. Dear all, Any one design hooks and stiffeners for pile cage for lifting from crane? and necessary welding calculation and specification according to Code and standard regarding this. or any one have any documents or data regarding this issue?
  9. Thanks your link.. In this doc. some statements mentioned about reclaimed soil. do u have any example related this?
  10. Dear All, is there any idea, how to design foundation on reclaimed soil above sea... Building is warehouse... If it required pile foundation, then what will be the depth of pile foundation... or any other idea...
  11. ok. thanks.. This data is not enough. But i try my best to do this..
  12. Dear All, Any one know about steel sheet pile design? is there any software do you have or any excel sheet regarding this? kindly share with me.
  13. Dear you designed helipad? kindly share your detail...
×
×